Geekbuying WW

Padma bridge – General knowledge

Padma bridge – General knowledge

Padma bridge - General knowledge
Padma Bridge
Furnitures

Visit for details

Details

Q: The date of the inauguration of the Padma Multipurpose Bridge?

Ans: June 25, 2022 (every Saturday)

Q: Where is the Padma Bridge located in Bangladesh?

Answer: Jajira of Shariatpur (west side and Mawa east side of Munshiganj).

Q: On what date was the foundation stone of the Padma Multipurpose Bridge laid?

Padma bridge – General knowledge

Answer: 04/07/2001

Q: Who laid the foundation?

Answer: Sheikh Hasina, daughter of Father of the Nation Bangabandhu.

Q: How many kilometers is the length of the Padma Bridge?

Answer: 6.15 (kilometers)

Q: What is the name of this Padma Bridge project?

Answer: Padma Multipurpose Bridge Project.

Q: What is the width of the Padma Bridge?

Answer: 72 feet.

Q: Where is the railway line on the Padma Bridge?

Answer: Downstairs

Q: How many kilometers of the river have been ruled on the Padma Bridge?

Answer: 12 kilometers on both sides

Q: What is the viaduct of the bridge? Me?

Answer: 3.18 km.

Q: How much is the road connecting the bridge?

Answer: 14 kilometers together.

Q: What is the cost of the construction of the PADMA BRIDGE?

Answer. The construction cost of the main part of the Padma Bridge is 28 thousand 793 crores 39 lakh rupees.

Q: How much money has been spent on river governance?

Answer: 6 thousand 706 crores 71 (eight thousand seven hundred and seven crores eighty-one lakh) rupees.

Q: How many pillars did it take to make the viaduct?

Ans. How many pillars did it take to make the viaduct of Padma Bridge?

Q: How fast is the Padma Bridge over the water?

Ans. Padma bridge is 60 feet high from the water.

Q: What is the depth of the pile to build the Padma bridge?

Answer: 383 feet.

Q: What is the total number of piles per pillar of the Padma Bridge?

Ans: The total number of piles in each pile for piling of Padma Bridge is 6.

Q: What is the total number of piles for piling the Padma Bridge?

Q: In what year was the work of the Padma bridge completed?

Answer. How much work on the Padma Bridge on completed in 2022?

Q: In which country is a case filed for corruption in the Padma Bridge?

A: In which country is a case filed in a Canadian court for corruption on the Padma Bridge?

Q: What was the outcome of the case of corruption in the Padma Bridge?

Answer: Could not prove any truth in the case of corruption in Padma Bridge.

(Explanation: The ruling Awami League government borrows money from the World Bank for the constructions of the Padma Bridge. Meanwhile, Grameen Bank Director Dr. Yunus was 60 years old. If he wants to resign from the post of director of the bank, he refuses to resign and files a case against the government in a Bangladeshi court.

But what is the use of filing a case? He went to the World Bank and complained that he did not want to lend money for the Padma Bridge. As a result, the World Bank did not give any loan to the Bangladesh government for the construction of the Padma Bridge.

Zia had made contradictory remarks about the bridge, saying, “I will not climb the Padma Bridge if it is built with a pair of claps.” But the Padma Bridge is not a pair of clap bridges. The main bridge. You tell me the work of the Padma bridge has not started. You need money to start work. Then, were to the World Bank for loan money.

The World Bank did not pay. And the work did not begin; How is corruption? Like these donkeys in Bangladesh, the officials of the World Bank also acted like donkeys. But the Awami League government decided to build the bridge with the money of the people of their country.

With the strong efforts of Prime Minister Sheikh Hasina, daughter of Bangabandhu Sheikh Mujib, the Padma Bridge was finally successfully built. Those who opposed the construction of the Padma Bridge were the then chairman of Grameen Bank. Razakars and anti-independence parties with Dr. Yunus.

A millions people in the southwestern region of Bangladesh will benefit. And those who oppose it, do they want the good of the country? Among them, BNP-Jamaat was in power from 2001-to 2006. But no initiative was taken to build the Padma bridge.

Didn’t work for people in this area? And if someone else does that, there is an obstacle that too. This BNP-Jamaat government made Bangladesh a terrorist state when it was in power from 2001-to 2006. In just five years, it became the No. 1 most corrupt country in the world. It leaves a deficit of Rs 2,000 crore. Failed to run the country completely.

Q: Everything that is on the Padma Bridge-

Answer. This two-tiered Padma bridge has 72 feet wide four-lane road above railways, gas lines, power lines, and internet optical fiber line facilities.

Q: What is the type of Padma Multipurpose Bridge?

A: This multi-purpose Padma bridge is made of steel and concrete.

Q: What is the number of pillars of the Padma Bridge?

Answer. The number of pillars of the Padma Multipurpose Bridge is 42.

Q: Which foreign company built the Padma Multipurpose Bridge?

A: The Padma Multipurpose Bridge was built by a foreign company, China Railway Group Ltd.

Q: Who does the Bangladesh government think is conspiring to stop the inauguration of the Padma Bridge?

Answer: The anti-independence razakar groups of Bangladesh.

Computer Knowlegde

Padma bridge – General knowledge Home Page

Leave a Reply

Your email address will not be published. Required fields are marked *